Northeast Lean Conference · 2026 · People & AI
The assistant wasn't there. You were.
What an AI is actually for when the work happens on the floor.
Every one of you was taught this first
Genchi genbutsu. Go to the actual place. Look at the actual thing.
A language model has never seen anything.
Where this started for me · Solar Cannabis Co · packaging & labeling
Two years ago the department showed up on the P&L as pure cost. Today it runs roughly three-quarters of its capacity co-packing for other brands.
It came from the floor, not a memo. Where product actually sat. Where the bottleneck actually lived, not where the office assumed.
Solar · packaging lineA question for the room
Every one is an hour not at the gemba. The document is necessary. The thinking is value-added. The keyboard time is the motion waste of the CI function itself.
Clearing the ground
What it is
It does the document work so the practitioner can be at the gemba. It works with what you hand it, like a new Black Belt on day one: the data file, the old procedure, what you personally saw.
The mechanism
| Important stepwhat | Key pointhow: what makes or breaks it | Reasonwhy: the actual consequence |
|---|---|---|
| Ask for the export | Say the data-safety line first | Names never enter the tool |
| Run the calculator | Never recompute by hand | Arithmetic mistakes are silent; a script's aren't |
| If a column is missing, stop | List what was found and what's needed. Never substitute a value | A guessed number is a defect passed downstream |
| Present the result | Every formula with the real numbers substituted | The reader can check it on a napkin |
| Close | What still needs a human, and one next step | The practitioner gets the last word |
You already know how to write one of these. The trainee happens to be software.
Design principle 1 of 5
Every number carries a source tag. An untagged number is a defect passed downstream, so there aren't any.
Background: Line 3 changeover Changeover, current: 47 min [observed, 6 runs] Target (prod. plan): 20 min [from system: MES] Capacity freed: 2.1 hr/day [user estimate] Die-cart travel: [NEEDS GEMBA] Who does ext. setup: [NEEDS GEMBA]
observed you saw it, counted it, timed it
from system MES, historian, maintenance log
user estimate a guess, labeled as one
[NEEDS GEMBA] the andon. Go look.
No tag? Don't trust it. Ask where it came from. That's the whole discipline.
Design principles 2, 3, 4 of 5 · fast
Missing column? It says which, and never substitutes a value. Reason code it can't map? An explicit Unmapped row. OEE over 100%? Flagged, not printed: your "ideal" cycle time is probably an average.
The gemba-walk skill asks "what makes this step difficult?", never "why aren't you following the standard?" It will not hand you a punch list. A walk that only produces corrections is an inspection.
Coaching skills ask before they draft, left-to-right on the A3. Say "just draft it" and you get a draft in seconds, every unknown fact marked [NEEDS GEMBA], never invented.
Design principle 5 of 5 · emphasis on the people
Live · 4 minutes
Watch for four things: the data-safety line · every formula with numbers substituted · the Unmapped row · and where the last sentence sends me.
Same run, on a slide · Line 1 stamping · one shift · sample data
| Six big losses | min | |
|---|---|---|
| Breakdowns | 31 | |
| Setup & adjustments | 24 | |
| Idling & minor stops | 9 | |
| Unmapped: "elec", "waiting mat'l" | 8 |
What this skill did - OEE 72.0% on 480 planned min; breakdowns are the largest loss at 31 min. - Export does not separate planned from unplanned downtime; all 72 min treated as unplanned. What still needs a human - Is 0.5 min/unit best-demonstrated or an average? [ASSUMED — verify] - What "elec" means on the floor [NEEDS GEMBA] Suggested next step Take this to the line supervisor and confirm whether changeover is logged as downtime.
Where it goes wrong · and how to start anyway
Take it with you · MIT licensed · free to copy, change, and share
paulducey.com/gemba
The toolkit · the deck · a ten-minute getting-started guide
Paste one file into your assistant. Describe your problem. It picks the tool.
start-here · a3-coach · root-cause · problem-statement · kaizen-charter · gemba-walk · standard-work · twi-jbs · vsm-calc · oee-from-csv · 5s-audit · smed-setup · control-chart · fmea-builder · mistake-proofing · capacity-planner · daily-management

Let the assistant hold the clipboard.